STStrategyGuide
How to Write Technology Requirements Vendors Can Price Accurately
Vague requirements produce quotations that cannot be compared and projects that overrun. This guide shows how to describe outcomes, scope, quantities, performance, constraints and acceptance criteria so every vendor prices the same thing.
- Published
- Updated
- Reading
- 3 minutes
- Prepared by
- EngineSpire Technologies
Key points
- Describe outcomes, performance and compatibility needs instead of brands.
- Define scope boundaries: what is included, what is excluded and what your organization provides.
- Give quantities, locations and site conditions, and arrange site visits before quotations.
- State measurable performance, security and support requirements.
- Specify acceptance tests and a standard pricing format so offers can be compared.
Why requirements go wrong
- A brand or model is specified without a reason, which limits competition.
- Words such as "fast", "secure" and "reliable" mean different things to each vendor.
- Quantities are missing, so vendors guess.
- Site conditions are unknown until installation starts.
- There are no acceptance criteria, so "done" is argued about later.
- Unrelated work is bundled together, hiding the cost of each part.
Structure of a good requirements document
- Background and objectives.
- Current environment.
- Scope of work, with inclusions and exclusions.
- Functional requirements.
- Technical and performance requirements.
- Security, privacy and compliance requirements.
- Site information and constraints.
- Deliverables, including documentation and training.
- Schedule and milestones.
- Acceptance criteria and tests.
- Warranty, support and service levels.
- Vendor qualifications and submission requirements.
- Pricing format.
- Evaluation criteria.
Make requirements measurable
| Vague | Measurable example |
|---|---|
| Fast Wi-Fi in classrooms | Wi-Fi designed for 40 concurrent devices per classroom using video, verified by a post-installation survey against stated signal and capacity criteria |
| Reliable internet | Two internet services from different providers with automatic failover, tested at handover |
| A secure system | MFA for all administrative access, logs kept for an agreed period, and no unresolved critical findings in a vulnerability scan before acceptance |
| Enough CCTV storage | 30 days of continuous recording for 64 cameras at measured bitrates, surviving the failure of one drive |
| Good support | Critical issues answered within an agreed time, around the clock, with on-site attendance within an agreed time in named locations |
Scope boundaries
| Included | Excluded | Provided by the client |
|---|---|---|
| Supply, installation, configuration and testing of network equipment | Civil works and electrical works | Ceiling access, building permits, power outlets |
| Migration of listed mailboxes and files | Clean-up of historical data | Administrator access and user communication |
| Documentation and administrator training | End-user training | Training venue and attendees |
Quantities and site information
- Scaled floor plans with the number of outlets, access points or cameras per area.
- Cable routes, ceiling types and any areas that are hard to reach.
- Building rules, working hours and permit requirements.
- Photos of equipment rooms and existing installations.
- A scheduled site visit for all interested vendors before the quotation deadline.
Standards and brands
Reference standards and interoperability requirements rather than brands: cabling standards for structured cabling, ONVIF profiles for IP cameras, WCAG 2.2 for websites. If compatibility with existing systems genuinely requires a brand, say why and consider accepting equivalents. For government buyers, the New Government Procurement Act (Republic Act No. 12009) does not allow reference to brand names except for reasons such as technical compatibility, interoperability, servicing and maintenance; follow its implementing rules and Government Procurement Policy Board issuances.
Acceptance criteria
- Define the evidence for each deliverable: cable test reports, Wi-Fi survey results, failover and restore tests, security scan results.
- List required documentation: as-built drawings, configurations, asset lists and credentials handed over securely.
- Describe the sign-off process and how defects found during acceptance are handled.
- Link payment milestones to acceptance.
Pricing format
- An itemized bill of quantities for hardware, software licences with terms, labor and services.
- Recurring costs separated from one-time costs, over an agreed number of years.
- Optional items priced separately.
- Assumptions listed explicitly.
- Currency, taxes and how long the quotation remains valid.
Evaluation
- Publish evaluation criteria and their weights.
- Ask vendors to complete a compliance matrix stating whether each requirement is met fully, partly or not at all.
- Run clarifications in writing and share answers with all vendors.
- Compare total cost over the agreed period, not just the initial price.
Common questions
Should we specify brands in technology requirements?
Specify performance, compatibility and standards instead, unless a brand is genuinely needed to work with existing systems, and explain why. Brand-neutral requirements produce more competitive, comparable offers, and public procurement rules restrict brand references.
How detailed should requirements be?
Detailed enough that two qualified vendors would price the same scope: quantities, locations, performance targets, constraints, deliverables and acceptance tests. Avoid prescribing implementation details you do not need to control.
Why let vendors visit the site before quoting?
Site conditions such as ceiling access, cable routes, power and building rules change costs significantly. A site visit reduces assumptions and the change orders that follow them.
Sources and further reading
- [1]Republic Act No. 12009: New Government Procurement Act — Lawphil Project
- [2]Government Procurement Policy Board — GPPB
- [3]ONVIF Profiles — ONVIF
- [4]Web Content Accessibility Guidelines (WCAG) 2.2 — W3C
Need this applied to your environment?
We can turn this guide into a scoped assessment of your own sites, systems and constraints.
Keep reading
- STTechnology Planning for a New Office in the PhilippinesA new office needs internet, network, devices, security, phones and meeting rooms ready on day one, planned around building rules, carrier lead times, power reliability and natural hazards. This guide puts the decisions in order.4 min read
- STIT Due Diligence Checklist for Business ExpansionAcquiring a company, taking over a site or expanding with a partner brings their technology, contracts, risks and data obligations with it. This checklist covers what to review before committing and what to plan for the first months after.3 min read
- STTotal Cost of Ownership for Enterprise Technology ProjectsThe purchase price is often a minority of what a technology system costs over its life. This guide shows how to build a total cost of ownership model that covers implementation, operations, licences, staff time, risk and exit, and how to compare options fairly.3 min read
